Seawater compact system in Tunisia
A second system was installed in a health center of the small rural village of Jedaria in September 2010. The nominal water production is 120 l/day of 200 ppm
Characteristics of the installation:
- 6,5 m2 of solar collector
- 130 liter distillate tank
- Remineralisation, disinfection and tapping water 24h/day.
- Water circulation every 12 hours
- Water management protocol: regular monitoring of water temperature, conductivity, PH, alkalinity, etc.